Case Study:
Glenmorangie

+ + + +

Slide

Glenmorangie

+++++++

Glenmorangie’s bottling facility was officially opened in September 2011. The facility at Alba Campus has two bottling halls and is designed for efficient use of energy and water. Glenmorangie are part of the LVMH Moët Hennessy Louis Vuitton group, who are the world’s leading luxury products group, which comprises the Wines and Spirits activities of LVMH and includes such notable brands as Moët & Chandon, Dom Pérignon, Krug, Veuve Clicquot, Hennessy & Glenmorangie.

Slide

"The entire Glenmorangie team is delighted with the support Zenergi Group offer and the way they conduct their business- very professional. We have achieved savings of 55% during this period and identified areas to focus and maintain savings in a structured approach going forward."

Michael Scotland, Facilities & Projects Director Glenmorangie

Slide

Requirement

The Glenmorangie bottling plant at Alba, Livingston were experiencing high energy costs and concerns with temperature changes across the estate. With a BeMS platform in place controlling the site operationally, Alba was looking for a standalone solution that could monitor energy and temperature to allow for further investigations to breakdown the site and look for ways to be more efficient and to provide a better user experience for staff and visitors.

What Zenergi Group did

Zenergi Group were selected to install an AM&T platform that would initially monitor the temperatures within the offices throughout the building. We were able to identify immediately that the temperatures were reaching 25 + degrees C. With the temperature sensors wireless and positioned within the offices we were able to reduce the temperature settings within the BeMS taking into account the positioning of the office windows.

The savings achieved from a simple reduction in temperature was 6% on the Gas consumption.

The next steps were to monitor the Compressors. The site has a mix of large and small compressors managed by Babcock and that would switch between them depending on demand. We found the large compressor was left on for a longer period than required. We were quickly able to arrange for the correct controls to allow for further reduced consumption. In addition to the savings above, the site at Alba was closed due to the coronavirus outbreak. We worked closely with the site to ensure the building, compressor, AHU’s were reduced in accordance with occupancy. We were able to confirm a saving of 59% on Electricity and 52% on Gas.

30 Jun 2023

Part of the Zenergi family

We are preferred partner and supplier to many associations including ASCL, WASBM, LASBM, BASBM, CAPSA and have been in partnership with some for over a decade. We regularly attend their conferences and give members the Positive Zenergi experience based on their needs.

Zenergi are also an approved partner with the Institute of School Business Leadership, offering ISBL members the provision of a customer service specialising in energy procurement, invoice validation and contract management.

We are proud in our unique offering, based around customer service excellence. We audit the suppliers we work with to make sure our customers are getting the best value and service and are pleased to offer OJEU compliant pricing.