Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Search in posts
Search in pages
đź•‘ 1 minute read

Slide 1

Case Study:
Victoria Point

+ + + +

Slide

Victoria Point

+++++++
Minimising energy use and providing Electric Vehicle charging points for luxury 200+ apartment development

Victoria Point is a development of 216 luxury apartments located in the heart of Ashford, close to Ashford International Train Station. As a significant development in the local community, the developer, Elevate Property Group, recognised its responsibility to demonstrate that it is playing its part in committing to proactive carbon reduction initiatives that mitigate Climate Change.

Slide

“The Victoria Point, Ashford, project was a great success. Briar was appointed to the design team to provide Mechanical and Electrical building services designs for this new build project. Their industry and sector expertise was evident from the start, allowing them to quickly familiarise themselves with the project goals and effectively produce the designs. We will be pleased to work with Briar on further projects.”

Gareth Belsham, Director National Head of Building Consultancy at Naismiths

Slide

Project overview

Briar designed and coordinated the full mechanical and electrical services which included the installation of a centralised heating system provided by a domestic district heating system serving all apartments; LED lighting throughout, Electric Vehicle charging and all new metered utility connections.

Results

Briar’s 30+ years of expertise in delivering large-scale low carbon mechanical and electrical engineering projects enabled an experienced team to be put together to design and project manage the required work to the highest standards, while minimising energy consumption for this luxury flagship development.

Full mechanical and electrical services, design, drawings, and specifications were developed, and the team attended regular meetings with the client, as well as all delivery partners to ensure the project met quality expectations and remained on track for the delivery timescales.

On completion of the project, Energy Performance Certificates were produced by Briar’s energy assessors team.

The project will deliver long-term energy efficiency benefits to the residents through the inherently low carbon technologies installed, while ensuring the development is future-proofed through the access to the electric vehicle charging points.

Slide

Download

Victoria Point

Electric Vehicle charging points

09 Mar 2023

Part of the Zenergi family

We are preferred partner and supplier to many associations including ASCL, WASBM, LASBM, BASBM, CAPSA and have been in partnership with some for over a decade. We regularly attend their conferences and give members the Positive Zenergi experience based on their needs.

Zenergi are also an approved partner with the Institute of School Business Leadership, offering ISBL members the provision of a customer service specialising in energy procurement, invoice validation and contract management.

We are proud in our unique offering, based around customer service excellence. We audit the suppliers we work with to make sure our customers are getting the best value and service and are pleased to offer OJEU compliant pricing.