Case Study

Glenmorangie: Cutting energy costs in half through strategic building optimisation.

Download now
Glenmorangie: Cutting energy costs in half through strategic building optimisation.

Cutting energy costs in half: resounding success for a renowned global distiller

Glenmorangie, a renowned Scottish whisky distillery and part of the Louis Vuitton Moët Hennessy (LVMH) group, faced high energy costs and fluctuating temperatures at its bottling facility.

Despite having a Building Energy Management System (BEMS), Glenmorangie sought a more focused solution to improve energy efficiency and reduce costs. By working closely with the team at Zenergi, the strategic execution resulted in significant savings- a 59% reduction in electricity consumption and a 52% reduction in gas usage.

Case study highlights

Relocating temperature sensors delivered a 6% reduction in gas consumption

Adjusting compressor controls reduced excess energy consumption.

Challenge

Glenmorangie’s bottling facility in Alba, Livingston, was facing high energy costs and inconsistent temperature control across the site. While a Building Energy Management System (BEMS) was in place to centrally manage energy use, Glenmorangie sought a more focused solution to improve energy efficiency, reduce costs and create a more comfortable environment for staff and visitors.

Solution

Zenergi installed an Automatic Monitoring and Targeting (AM&T) submetering platform. The aim was to track temperatures and energy consumption and identify efficiencies.

Key findings

We quickly discovered that temperatures were regularly exceeding 25°C, largely due to the location of wireless temperature sensors across the site. By relocating these sensors, we achieved an immediate 6% reduction in gas consumption through better temperature control.

Next, we assessed the compressors, which included both large and small compressors which were manually switched depending on demand. We found that the large compressor was left on for a longer period than required. By adjusting the controls we reduced excess energy consumption from the compressors.

Additionally, during the site closure due to the COVID-19 pandemic, we worked closely with the site team to minimise energy consumption by ensuring the building, compressors and air handling units (AHUs) were reduced in line with occupancy.

Results

Through these targeted control optimisations, Glenmorangie benefitted from improved comfort for occupants within the facility and significant energy savings:

  • 59% reduction in electricity consumption
  • 52% reduction in gas consumption

The entire Glenmorangie team is delighted with the support Zenergi Group offer and the way they conduct their business – very professional. We have achieved savings of 55% during this period and identified areas to focus and maintain savings in a structured approach going forward.

Michael Scotland

Facilities & Projects Director

Glenmorangie

Back to all Case Studies

Share

59% reduction in electricity consumption

52% reduction in gas consumption

Related case studies

Danes Educational Trust: Leveraging funding to drive decarbonisation and energy efficiency.
Leigh Academies Trust: Flexible contract saves over half a million pounds
PR Associates: Driving compliance and energy efficiency in schools.
Shropshire Council: Supporting targeted energy efficiency and public sector compliance.
Reading Borough Council: Future-proofing buildings to comply with 2030 energy efficiency targets.
Woodbridge High School: Protecting energy budgets in the London Borough of Redbridge.
Windmill Care: Applying consultancy expertise overturned debt of £40,000.
St Richard’s Hospice: Low carbon M&E project designed to minimise energy consumption.

Related Products

Non-Half-Hourly Meter Exchanges

Siteworks

Mechanical & Electrical (M&E) Condition Survey

Solar PV

Public Sector Decarbonisation Scheme

Low Carbon Skills Fund (LCSF)

Your Heat Decarbonisation Plan

Mechanical and Electrical Design

Renewables Obligation (RO) & Contracts for Difference (CfD)

Electric Vehicle (EV) Charging

Non-Half-Hourly Meter Exchanges

Siteworks

Mechanical & Electrical (M&E) Condition Survey

Solar PV

Public Sector Decarbonisation Scheme

Low Carbon Skills Fund (LCSF)

Your Heat Decarbonisation Plan

Mechanical and Electrical Design

Renewables Obligation (RO) & Contracts for Difference (CfD)

Electric Vehicle (EV) Charging

Non-half-hourly meter exchanges

New regulation is coming into force which means that every organisation’s electricity will need to be settled on a half-hourly basis. By October 2026 all electricity meters will need to be half-hourly. Don’t get left behind. If your meter is one of the circa 30 million affected by the regulation, it will need to be upgraded.

Learn More

Siteworks

With in-depth knowledge of complex siteworks processes, we can oversee any size of project, from single supply to multiple services, liaising with distribution networks, suppliers, and meter operators. With a focus on communication, the team collaborates to ensure projects are delivered on time and customers are fully informed throughout.

Learn More

Mechanical and Electrical Condition Survey

Our condition surveys offer a strategic approach to managing building assets by assessing their condition and lifecycle costs.

Learn More

Solar PV

We offer an end-to-end solar PV implementation service aligned with RIBA stages for seamless adoption of renewable energy to future-proof your site. From feasibility studies to performance design, technical design, construction and handover, our comprehensive offering ensures a smooth transition to clean, renewable energy.

Learn More

What is PSDS?

The Public Sector Decarbonisation Scheme (PSDS) is a government grant scheme administered by Salix Finance on behalf of the Department for Energy Security and Net Zero. Its aim is to support public sector bodies fund heat decarbonisation and energy efficiency measures.

Learn More

Low Carbon Skills Fund

The Low Carbon Skills Fund (LCSF) is a government grant programme administered by Salix Finance designed to support public sector organisations in undertaking energy audits, creating carbon reduction strategies, and developing robust heat decarbonisation plans. We can help your organisation prepare a successful application, determining your eligibility for the scheme, collating the data and evidence assessed against the scheme criteria, and making the necessary calculations.

Learn More

Heat Decarbonisation Plans

Heat decarbonisation plans are an essential tool for organisations looking to mitigate their contribution to climate change, achieve net zero goals, and future-proof reliable energy supply.

Learn More

Mechanical and Electrical Design

Our Mechanical and Electrical (M&E) Design services are designed to help customers achieve their energy efficiency and decarbonisation goals, while avoiding unnecessary costs and optimising building performance.

Learn More

Renewables Obligation and Contracts for Difference

When you need to consume a lot of energy to run your business, understanding how to benefit from energy cost reduction schemes can result in cost savings and reduced environmental impact.

Learn More

Electric Vehicle Charging

Our service offers a seamless transition to electric vehicle charging infrastructure, with a tailored solution that meets your needs now and in the future. 

Learn More

Non-half-hourly meter exchanges

New regulation is coming into force which means that every organisation’s electricity will need to be settled on a half-hourly basis. By October 2026 all electricity meters will need to be half-hourly. Don’t get left behind. If your meter is one of the circa 30 million affected by the regulation, it will need to be upgraded.

Learn More

Siteworks

With in-depth knowledge of complex siteworks processes, we can oversee any size of project, from single supply to multiple services, liaising with distribution networks, suppliers, and meter operators. With a focus on communication, the team collaborates to ensure projects are delivered on time and customers are fully informed throughout.

Learn More

Mechanical and Electrical Condition Survey

Our condition surveys offer a strategic approach to managing building assets by assessing their condition and lifecycle costs.

Learn More

Solar PV

We offer an end-to-end solar PV implementation service aligned with RIBA stages for seamless adoption of renewable energy to future-proof your site. From feasibility studies to performance design, technical design, construction and handover, our comprehensive offering ensures a smooth transition to clean, renewable energy.

Learn More

What is PSDS?

The Public Sector Decarbonisation Scheme (PSDS) is a government grant scheme administered by Salix Finance on behalf of the Department for Energy Security and Net Zero. Its aim is to support public sector bodies fund heat decarbonisation and energy efficiency measures.

Learn More

Low Carbon Skills Fund

The Low Carbon Skills Fund (LCSF) is a government grant programme administered by Salix Finance designed to support public sector organisations in undertaking energy audits, creating carbon reduction strategies, and developing robust heat decarbonisation plans. We can help your organisation prepare a successful application, determining your eligibility for the scheme, collating the data and evidence assessed against the scheme criteria, and making the necessary calculations.

Learn More

Heat Decarbonisation Plans

Heat decarbonisation plans are an essential tool for organisations looking to mitigate their contribution to climate change, achieve net zero goals, and future-proof reliable energy supply.

Learn More

Mechanical and Electrical Design

Our Mechanical and Electrical (M&E) Design services are designed to help customers achieve their energy efficiency and decarbonisation goals, while avoiding unnecessary costs and optimising building performance.

Learn More

Renewables Obligation and Contracts for Difference

When you need to consume a lot of energy to run your business, understanding how to benefit from energy cost reduction schemes can result in cost savings and reduced environmental impact.

Learn More

Electric Vehicle Charging

Our service offers a seamless transition to electric vehicle charging infrastructure, with a tailored solution that meets your needs now and in the future. 

Learn More