Transport for Greater Manchester: Siteworks team facilitate the extension of the UK’s largest tram system.

Download case study
Transport for Greater Manchester: Siteworks team facilitate the extension of the UK’s largest tram system.

Transport for Greater Manchester (TfGM) is the local government body responsible for delivering Greater Manchester’s transport strategy and commitments.

Keolis Amey Metrolink (KAM), a joint venture between Keolis and Amey, took over operations and maintenance of Manchester’s Metrolink for a period of up to 10 years from July 2017.

The Keolis Amey Metrolink tram system is the largest of its kind in the UK. It serves 99 stops across eight different lines along almost 103km of track, with a fleet of 120 modern trams catering for more than 34 million journeys a year.

Case study highlights

Critical path activity deadlines were all met throughout the project, due to effective communication and flexibility.

Using historical testing data from previous line openings, we were able to effectively estimate the usage and propose this to the meter operator.

Challenge

To facilitate the extension of the Trafford Park Line, from Manchester city centre to The Trafford Centre

Solution

The project involved working with the contractor, MPT, to manage the disconnections and site clearance for demolition on seven existing buildings along the proposed route; arranging the metering for the six new tram stops; and arranging three High Voltage and three Low Voltage substation meters

Once the disconnections and demolition works were complete, we worked alongside MPT and KAM to facilitate new meter installations and arranged the procurement of the energy supplies and metering contracts, ensuring a competitive price for the energy.

We identified a problem on each of the High Voltage substations after install. They were shorting which meant that meter data could not be retrieved and all sites were billing to zero usage. We worked with the meter operator, supplier and site engineers to resolve the issue. By having historical testing data from previous line openings, we were able to effectively estimate the usage and propose this to the meter operator which ensured that KAM and TfGM paid for accurate usage.

Result

Often working to tight deadlines, with short notice metering requirements and re-scheduled dates due to unforeseen circumstances at site, meant that close communication with stakeholders, including the client; engineers; contractors; and project managers was essential.

Critical path activity deadlines were all met throughout the project, due to the effective communication and flexibility.

 

 

We would highly recommend Zenergi for their wide range of services delivered and experience by their qualified, friendly and efficient team.

Daniel Vaughan

Commercial & Procurement Manager

Keolis Amey Metrolink

Back to all Case Studies

Share

Total contracting value £4m+

Related case studies

Glenmorangie: Cutting energy costs in half through strategic building optimisation.
Danes Educational Trust: Leveraging funding to drive decarbonisation and energy efficiency.
Leigh Academies Trust: Flexible contract saves over half a million pounds
PR Associates: Driving compliance and energy efficiency in schools.
Shropshire Council: Supporting targeted energy efficiency and public sector compliance.
Reading Borough Council: Future-proofing buildings to comply with 2030 energy efficiency targets.
Woodbridge High School: Protecting energy budgets in the London Borough of Redbridge.
Windmill Care: Applying consultancy expertise overturned debt of £40,000.

Related Products

Non-Half-Hourly Meter Exchanges

Zen Zero

Siteworks

Accreditations

Mechanical & Electrical (M&E) Condition Survey

Solar PV

Public Sector Decarbonisation Scheme

Low Carbon Skills Fund (LCSF)

Your Heat Decarbonisation Plan

Mechanical and Electrical Design

Non-Half-Hourly Meter Exchanges

Zen Zero

Siteworks

Accreditations

Mechanical & Electrical (M&E) Condition Survey

Solar PV

Public Sector Decarbonisation Scheme

Low Carbon Skills Fund (LCSF)

Your Heat Decarbonisation Plan

Mechanical and Electrical Design

Non-half-hourly meter exchanges

New regulation is coming into force which means that every organisation’s electricity will need to be settled on a half-hourly basis. By October 2026 all electricity meters will need to be half-hourly. Don’t get left behind. If your meter is one of the circa 30 million affected by the regulation, it will need to be upgraded.

Learn More

Zen Zero

Define your carbon footprint and accelerate your journey to net zero.

Learn More

Siteworks

With in-depth knowledge of complex siteworks processes, we can oversee any size of project, from single supply to multiple services, liaising with distribution networks, suppliers, and meter operators. With a focus on communication, the team collaborates to ensure projects are delivered on time and customers are fully informed throughout.

Learn More

Accreditations

Our comprehensive approach to achieving sustainability goals and certifications delivers cost-effective measures and optimised building performance. We guide organisations through practical and attainable processes, helping to achieve sustainability goals and certifications, while reducing costs and optimising building performance.

Learn More

Mechanical and Electrical Condition Survey

Our condition surveys offer a strategic approach to managing building assets by assessing their condition and lifecycle costs.

Learn More

Solar PV

We offer an end-to-end solar PV implementation service aligned with RIBA stages for seamless adoption of renewable energy to future-proof your site. From feasibility studies to performance design, technical design, construction and handover, our comprehensive offering ensures a smooth transition to clean, renewable energy.

Learn More

What is PSDS?

The Public Sector Decarbonisation Scheme (PSDS) is a government grant scheme administered by Salix Finance on behalf of the Department for Energy Security and Net Zero. Its aim is to support public sector bodies fund heat decarbonisation and energy efficiency measures.

Learn More

Low Carbon Skills Fund

The Low Carbon Skills Fund (LCSF) is a government grant programme administered by Salix Finance designed to support public sector organisations in undertaking energy audits, creating carbon reduction strategies, and developing robust heat decarbonisation plans. We can help your organisation prepare a successful application, determining your eligibility for the scheme, collating the data and evidence assessed against the scheme criteria, and making the necessary calculations.

Learn More

Heat Decarbonisation Plans

Heat decarbonisation plans are an essential tool for organisations looking to mitigate their contribution to climate change, achieve net zero goals, and future-proof reliable energy supply.

Learn More

Mechanical and Electrical Design

Our Mechanical and Electrical (M&E) Design services are designed to help customers achieve their energy efficiency and decarbonisation goals, while avoiding unnecessary costs and optimising building performance.

Learn More

Non-half-hourly meter exchanges

New regulation is coming into force which means that every organisation’s electricity will need to be settled on a half-hourly basis. By October 2026 all electricity meters will need to be half-hourly. Don’t get left behind. If your meter is one of the circa 30 million affected by the regulation, it will need to be upgraded.

Learn More

Zen Zero

Define your carbon footprint and accelerate your journey to net zero.

Learn More

Siteworks

With in-depth knowledge of complex siteworks processes, we can oversee any size of project, from single supply to multiple services, liaising with distribution networks, suppliers, and meter operators. With a focus on communication, the team collaborates to ensure projects are delivered on time and customers are fully informed throughout.

Learn More

Accreditations

Our comprehensive approach to achieving sustainability goals and certifications delivers cost-effective measures and optimised building performance. We guide organisations through practical and attainable processes, helping to achieve sustainability goals and certifications, while reducing costs and optimising building performance.

Learn More

Mechanical and Electrical Condition Survey

Our condition surveys offer a strategic approach to managing building assets by assessing their condition and lifecycle costs.

Learn More

Solar PV

We offer an end-to-end solar PV implementation service aligned with RIBA stages for seamless adoption of renewable energy to future-proof your site. From feasibility studies to performance design, technical design, construction and handover, our comprehensive offering ensures a smooth transition to clean, renewable energy.

Learn More

What is PSDS?

The Public Sector Decarbonisation Scheme (PSDS) is a government grant scheme administered by Salix Finance on behalf of the Department for Energy Security and Net Zero. Its aim is to support public sector bodies fund heat decarbonisation and energy efficiency measures.

Learn More

Low Carbon Skills Fund

The Low Carbon Skills Fund (LCSF) is a government grant programme administered by Salix Finance designed to support public sector organisations in undertaking energy audits, creating carbon reduction strategies, and developing robust heat decarbonisation plans. We can help your organisation prepare a successful application, determining your eligibility for the scheme, collating the data and evidence assessed against the scheme criteria, and making the necessary calculations.

Learn More

Heat Decarbonisation Plans

Heat decarbonisation plans are an essential tool for organisations looking to mitigate their contribution to climate change, achieve net zero goals, and future-proof reliable energy supply.

Learn More

Mechanical and Electrical Design

Our Mechanical and Electrical (M&E) Design services are designed to help customers achieve their energy efficiency and decarbonisation goals, while avoiding unnecessary costs and optimising building performance.

Learn More