Case study

Share

National Express: Preparing for a decarbonised travel network with an energy-efficient bus depot

As part of a regeneration of Birmingham’s Perry Barr area, Birmingham City Council has given a new lease of life of its 90-year-old bus depot, moving to a brand-new state- of-the-art facility designed for a net zero future.

Read time - 2 minutes
Download case study
National Express: Preparing for a decarbonised travel network with an energy-efficient bus depot

As part of a regeneration of Birmingham’s Perry Barr area, Birmingham City Council has given a new lease of life of its 90-year-old bus depot, moving to a brand-new state- of-the-art facility designed for a net zero future.

Case study highlights

A 432m² green roof with a 22-species planting mix on an ultra-light sedum, helping improve air quality and habitats for wildlife

Heating via a hybrid system including Air Source Heat Pumps (ASHP), electric overhead radiant panels & Variable Refrigerant Flow, supplemented with solar panels, meaning there is no need for gas onsite

Improved working environment for the bus depot's 450 drivers, engineers and back office staff.

14 electric vehicle bays with capacity to accommodate a full fleet of electric buses

Challenge

The previous National Express West Midlands Perry Barr depot had been in operation since 1932. In support of meeting the UK’s 2050 net zero target, National Express West Midlands had worked to reduce its carbon emissions, but the legacy of an old building built before energy efficiency was a consideration limited what could be achieved. Birmingham City Council recognised the opportunity that a new building could offer to reduce its carbon footprint and prepare for a future decarbonised travel network.

Solution

Zenergi was appointed by the building contractor, BAM, to undertake the mechanical and electrical (M&E) design of the project, featuring a range of sustainable innovations and technology to create a highly energy efficient future-proofed depot.

The new 6.5-acre site with parking spaces for more than 170 buses, 12 maintenance bays, 3 fuel bays, and 4 wash bays, features the following energy-efficient and sustainable features implemented by Zenergi’s M&E engineers:

  • 150 solar PV panels
  • Heating via a hybrid system including Air Source Heat Pumps (ASHP), electric overhead radiant panels & Variable Refrigerant Flow, supplemented with solar panels, meaning there is no need for gas onsite
  • A 432m² green roof with a 22-species planting mix on an ultra-light sedum, helping improve air quality and habitats for wildlife
  • A green wall on acoustic panelling to help improve air quality whilst reducing noise pollution
  • A wildflower garden behind the acoustic panelling to improve habitats for wildlife
  • A self-contained water recycling system for bus washes
  • Rainwater harvesting for chassis wash
  • 14 electric vehicle bays with capacity to accommodate a full fleet of electric buses

Results

The new Perry Barr bus depot has transformed how National Express West Midlands works, evolving their operations to use less energy, and operate more safely and efficiently. The depot also improves the working environment for its 450 drivers, engineers and back office staff, offering snooker tables; a fish tank; a café; rest areas and quiet spaces; shower facilities; and dedicated training rooms. The focus on improving the staff environment supports the work National Express West Midlands has already undertaken to ensure a career in public transport is rewarding.

Related case studies

Glenmorangie: Cutting energy costs in half through strategic building optimisation.

Glenmorangie sought a focused solution to improve energy efficiency and reduce costs. By working closely with the team at Zenergi, the strategic building optimisation resulted in a 59% reduction in electricity consumption and a 52% reduction in gas usage.

Read the full story

Danes Educational Trust: Leveraging funding to drive decarbonisation and energy efficiency.

Danes Educational Trust selected Zenergi as its trusted carbon reduction partner, securing £166,000 in grant funding for heat decarbonisation and energy efficiency upgrades. 

Read the full story

Leigh Academies Trust: Flexible contract saves over half a million pounds

Leigh Academies Trust adopted Zenergi’s Zen Flex Bespoke product to take advantage of market movements by purchasing a volume of energy up front, while also trading on the day-ahead market to spread the risk of the volatile markets.

Read the full story

PR Associates: Driving compliance and energy efficiency in schools.

Zenergi’s services for PR Associates keep schools up to date with energy compliance, as well as driving energy efficiency to reduce costs and carbon emissions.

Read the full story

Shropshire Council: Supporting targeted energy efficiency and public sector compliance.

Zenergi supports Shropshire Council’s vision to stabilise and progressively reduce its environmental footprint., with the provision of Display Energy Certificates, which it has carried out for the Council for over 10 years. 

Read the full story

Reading Borough Council: Future-proofing buildings to comply with 2030 energy efficiency targets.

Zenergi carried out the delivery of commercial Energy Performance Certificates for 52 properties in Reading to meet compliance with the Minimum Energy Efficiency Standards.

Read the full story

Woodbridge High School: Protecting energy budgets in the London Borough of Redbridge.

School Business Professionals are increasingly challenged to balance shrinking budgets and escalating operating costs. However, energy is an area that offers opportunities to protect school budgets through a competitive tender process that proactively secures prices that take advantage of low wholesale market positions where possible.

Read the full story

Windmill Care: Applying consultancy expertise overturned debt of £40,000.

We started working with Windmill Care when we successfully negotiated good tariffs for gas and electricity contracts for the group’s three care homes. But, before they went live, Windmill Care’s incumbent supplier identified a billing issue.

Read the full story