Webinar
05 Oct 2026

Applications for the British Industrial Competitiveness Scheme (BICS) are now open and close on 30 November 2026. This gives eligible UK manufacturers a limited window to apply for support that could reduce their electricity costs by up to £40/MWh.
Alongside operating within an eligible sector, applicants must demonstrate that a sufficient proportion of their electricity consumption is attributable to eligible manufacturing activities.
Access presentation slides from Zenergi’s Andy Pinder and Harry Eaves detailing how BICS could reduce your energy costs and strengthen your competitiveness. These practical webinar slides outline the eligibility criteria, application process, and potential savings available through the scheme.

What BICS is and the potential savings available
Who can apply and how the level of support is calculated
How your eligibility can be assessed
What information is required for an application
How Zenergi can manage your application and help you navigate the scheme